fulmrzu2

2012

The first optical table arrived!  

 

We finished a major reconstruction work in the laboratory including a separate power line, high temperature stability, an even distribution of cooled air, protection from the electromagnetic radiation, mechanical and acoustic isolation.

After:

Before: 

 

New power line (15 kW + 10 kW).